Railroad Track Training and Track Inspection
     
         
Railroad Track Training and Track Inspection Services
Track Guy Railroad Track Training
Track Guy Railroad Track Projects

 

Railroad Track Safety, Quality, Efficiency, Responsibility, Integrity

 

Projects Sheet #4

John has built, managed and overseen numerous projects including installation and maintenance of ballasted track, direct fixation track, embedded track, yard relocation and yard maintenance, a car wash track, and 3rd rail installation. John has performed emergency red tag work. His passion is Railroad Track. Give The Track Guy a call or drop him an email and judge for yourself. He truly enjoys TALKING TRACK!
Email: zuspan@trackguy.com

1980

TW-6 ballasted track and direct fixation track

TW-6, Rockville Route (WMATA) $17,000,000: 16 miles of new ballasted track and 16 miles of new direct fixation track and a yard at Shady Grove with 48 turnouts.

Uptown/Downtown, Brooklyn and Manhattan Working nights, midnight to 5:00 am removed and re-built 6,800' of track including concrete encasement.

NYC Zone I track rehab and turnouts

Zone I (NYCT) $15,000,000.-track: Total rehab of track and turnouts including emergency red tag work spread out over 27 miles of track in Brooklyn.

Westchester design car wash track

Westchester Yard (NYCT) $4,000,000 -track: New track, turnouts and 3rd rail installation.

Jamaica Barn (NYCT) Design and construct temporary car wash track to expedite new yard construction.

1978

US Steel track maintenance

United States Steel, Fairless Hills, PA Maintenance of all track (100 miles and 300 turnouts) in the steel plant.

Eisenhower Yard relocate yard tracks and turnouts

Eisenhower Yard, Southern Railroad, Alexandria, VA Tear-up, construct and relocate yard tracks and turnouts.

TW-5 turnouts

TW-5 WMATA, Washington, DC Built 44 turnouts.

1977

VW Plant lead track, yard track, turnouts

VW Rabbit Plant, New Stanton, PA New construction of 4 miles of lead track and 9 miles of yard track with 67 turnouts.

1976

Dukeland ballasted track and mainline

Dukeland St., Baltimore, MD John's first job as a supervisor. Built 1 mile of ballasted track and 3 turnouts.

TW-3, portable welding plant

TW-3, Washington, DC Supervisor of portable welding plant at New Carrolton rail yard.

I-83 embedded track, girder rail

I-83 Project, Baltimore , Maryland Removal and installation of embedded track using new girder rail section.

Projects 1 | Projects 2 | Projects 3 | Projects 4

 

       
Copyright © 2004-2008 Track Guy Consultants
Web Site Design and Development by www.web-makeovers.com